As part of The Press Adaptive Re-Use campus project, the tenant, required additional space for fabrication, research and office.
Physically separated from the cluster of main buildings, the R&D building establishes a connection in the landscape, its main entry an extension of a welcome pavilion and the planted promenade.
Along the north side of the building, a wide landscaped strip and pedestrian path act as the primary connection, alternating between trees, low planting, enclosed patios, and informal seating.
The interior is split into two sections, a full height R&D section and a three-story area with additional R&D spaces at level one & two, and office space on level three.
Location
Costa Mesa, CA
Client
Steel Wave LLC 5 Ronin
Year
2023
Status
Completed
Size
184,677 sf
Collaborators
- Del Amo Construction - General Contractor
- Saiful Bouquet - Structural
- ME Engineers - MEP Engineer
- LRM - Landscape
- Tait & Associates - Civil
- BOLD - Lighting
Photographers
- Paul Vu